PLACEHOLDER POST for template testing. Replace or delete before launch.
The bowl and street section at Bath Skatepark reopened this week after six weeks of resurfacing. Crews replaced the coping along the deep end, rebuilt the quarterpipe that had been closed since last autumn, and resealed the flat.
What changed
The resurfacing addressed drainage problems that had been closing the park after heavy rain. New coping means the bowl is rideable again at full height.
- Bowl coping replaced along the deep end
- Quarterpipe rebuilt and reopened
- Flat resealed and regraded for drainage
Hours
The park is open daily. Helmets are required for riders under 16, and loaner helmets are available at the front desk at no cost.